Today through Weds evening dredging of the mouth of the slough will be taking place.
Tuesday afternoon it will be possible to put all the boats back on the " inside East of the Gas Dock".
Thursday the launch ramp will be closed from 7 am to 7 pm so that the dredging equipment can be disassembled and removed .
Friday , everything should look as if the dredging never took place except that the water will be deeper just about everywhere..